What is this machine used for?
Tiezheng vertical lathes are reviewed for turning round, disc, ring and flange-type workpieces where vertical loading, part diameter, fixture stability and machining sequence drive machine selection. Buyers should compare the part drawing, material, blank condition, tolerance, loading method and required operations before choosing a TY or related vertical-lathe series.
When should a buyer consider a vertical lathe?
A vertical lathe is a practical route when a rotational workpiece is easier to load, locate and support with its main axis vertical. The decision should be based on the complete part drawing and process plan, not on diameter alone. Buyers should compare workholding, tool access, chip flow, loading safety, inspection needs and any secondary drilling or milling operations.
What verified machine evidence is available?
The following WordPress Media Library images are tied to current Tiezheng ledger records. They verify visible machine identity, guarding and workshop context only. They do not by themselves prove exact travel, spindle performance, accuracy, production rate or certificate scope.



How should vertical-lathe models be compared?
Start from the workpiece and operation route. Exact TY model specifications remain outside this category page until the shared parameter source and each model column complete engineering review. This prevents a family-level comparison from becoming an unsupported purchase specification.
| Buyer input | Why it matters |
|---|---|
| Outside and inside diameters, height and weight | Defines the required work envelope, loading method and workholding review. |
| Material, hardness and blank condition | Changes tooling, cutting load, chip control and process planning. |
| Tolerance and surface requirement | Sets the engineering and acceptance-test discussion. |
| Operation list and tool access | Determines whether turning alone is sufficient or compound operations need review. |
| Annual volume and target cycle time | Guides loading, workholding and automation scope without promising an unverified output rate. |
Which videos help with the first technical review?
These verified media files provide machine, operation and installation context. They are linked directly to keep the page lightweight; buyers can review the evidence before sending drawings.
- TY400 vertical lathe product video – visible machine layout and operating context.
- TY500 CNC vertical lathe demo – visual reference for the machine and machining discussion.
- TY700 installation and assembly workshop video – physical handling, assembly and setup context.
What should be included in a vertical-lathe RFQ?
- Part drawing, dimensions, weight, material grade and blank condition.
- Required turning, grooving, drilling, milling or other operations.
- Tolerance, surface requirement and proposed inspection method.
- Workholding concept, loading method, annual volume and target cycle time.
- Destination country, preferred CNC control and acceptance-test expectations.
Use the RFQ checklist to prepare technical inputs, then send the project to Tiezheng. Buyers who are still comparing routes can start from the machine selector or return to the machine category hub.
How are service and compliance questions handled?
Service scope, installation planning and documentation depend on the selected model, destination and contract. Review the public service and support boundary and the certificate resource policy. A certificate page is a due-diligence resource, not a blanket compliance claim for every vertical-lathe configuration.
Buyer questions before model selection
Can the images be used as final technical specifications?
No. They are visual evidence for machine identity and context. Final specifications must come from the reviewed model source and quotation package.
Why are exact TY specifications not shown here yet?
The shared source is under identity and engineering review. Withholding unreviewed numbers protects buyers from using a family matrix as an approved purchase specification.
Can Tiezheng review a part before a model is selected?
Yes. Send the drawing, material, tolerance, operation list and production requirements so the engineering discussion can narrow the suitable machine route.
Does this page claim a fixed certificate scope?
No. Compliance and documentation must be checked for the exact model, configuration and destination market.