Machine specification

Tiezheng SFA/T2012 Light-Duty Gantry Machining Center

The Tiezheng SFA/T2012 is a light-duty gantry machining center, also identified as SFA2012 in first-party factory footage. Published specifications list a 2000 × 1200 mm worktable, 2100/1200/550 mm X/Y/Z travel and 2230 mm gantry width. Final spindle, CNC control, tooling and supplied options are confirmed during engineering review and in the signed technical agreement.

Tiezheng SFA/T2012 light-duty gantry machining center shown during a first-party factory demonstration.
Product media Tiezheng SFA/T2012 light-duty gantry machining center shown in first-party factory footage.
ModelSFA/T2012
Machine categoryGantry Machining Centers
SeriesSfa T Series
Configuration reviewDrawing-led RFQ

Key specifications

Machine type Light-duty gantry machining center
Worktable dimensions 2000 × 1200 mm
X-axis travel 2100 mm
Y-axis travel 1200 mm
Gantry width 2230 mm
Z-axis travel 550 mm

What is this machine used for?

What is the Tiezheng SFA/T2012?

The Tiezheng SFA/T2012 is a light-duty gantry machining center, also identified as SFA2012 in first-party factory footage. Published specifications list a 2000 × 1200 mm worktable, 2100/1200/550 mm X/Y/Z travel and 2230 mm gantry width. Final spindle, CNC control, tooling and supplied options are confirmed during engineering review and in the signed technical agreement.

Which SFA/T2012 specifications are published?

Key published specifications include a 2000 × 1200 mm worktable, X-axis travel of 2100 mm, Y-axis travel of 1200 mm, Z-axis travel of 550 mm and gantry width of 2230 mm.

How should buyers evaluate the SFA/T2012?

Start with the part drawing and machining requirements. Engineering review should confirm part geometry, weight, material, tolerances, operations, fixture clearance, cutter access, tooling, chip handling, utilities, automation, cycle target, electrical standard and destination requirements.

How is an SFA/T2012 quotation prepared?

The RFQ is reviewed against the drawing, production target, utilities and required delivery scope before the signed technical agreement and quotation are issued.

Are SFA2012 and SFA/T2012 the same model?

Yes. SFA2012 and SFA/T2012 are two designations for the same model.

What should buyers send for an SFA/T2012 RFQ?

Send the part drawing, material, overall dimensions and weight, critical tolerances, required operations, annual volume, target cycle time, workholding or automation requirements, electrical standard and destination country.

Does this page define the supplied spindle, controller or tool magazine?

No. The spindle, CNC control and tool-magazine configuration are confirmed for the supplied machine in the signed technical agreement.

How should the stated worktable and travel values be applied?

Engineering review must confirm the complete part and fixture envelope, support, tool access, load distribution and safe setup before quotation.

How is the supplied configuration confirmed?

The supplied configuration is confirmed against the buyer’s drawing, process, utilities and signed technical agreement before quotation and supply.

Technical documents

Which documents should buyers review?

Request the latest configuration details, drawing review and applicable technical documents with your RFQ.

Related decision pages

Where should buyers go next?

Configuration review

Check this model against your part and production target

Send the drawing, material, critical tolerances, annual volume, target cycle time, automation requirement and destination country.

Start model RFQ
Email Us
Talk to Tiezheng

Send your model, drawing or machining requirements.

sales@apexspm.com Open email app

Use the enquiry form instead