What is this machine used for?
What is the Tiezheng SVA/T4550?
The SVA/T4550 is a moving-column machining center documented by the reviewed T4550 column in the SVA/T family parameter matrix and three source-assigned factory assembly views. The public values support technical screening; workpiece suitability and the final supplied configuration require drawing and RFQ review.
Which worktable and travel values are source-listed?
The reviewed source lists a 5000 x 500 mm worktable, 4500 x 550 mm X/Y travel, 550 mm standard Z travel and 700 mm optional Z travel. Buyers should confirm fixture length, part support, tool access, datum strategy and the required Z configuration against the actual workpiece.
Which spindle and tool-magazine data are documented?
The reviewed standard records list a BT40 direct-drive spindle at 12000 rpm and a 24-tool disc mechanical-arm magazine. The control system, electrical standard, tooling, workholding, chip management and other project requirements must be confirmed in the signed quotation and technical agreement.
Why is no T4550 video shown?
An uploaded T4550-labelled video contains a travel overlay that conflicts with the reviewed T4550 parameter column. It is intentionally excluded from this page until a corrected source or engineering-approved explanation resolves the conflict.
How should buyers compare the SVA/T4550?
Use the approved rows to screen worktable length, X/Y travel, standard or optional Z travel, spindle interface, spindle speed and tool capacity. Confirm workpiece support, fixture layout, tolerances, process sequence, site access and acceptance method through RFQ.
What should be sent for an SVA/T4550 RFQ?
Send the part drawing, material, critical tolerances, overall profile length, annual volume, target cycle time, required operations, preferred control, workholding or automation requirement and destination country.
Does this page define the final supplied machine?
No. It presents reviewed source values and source-assigned factory context for comparison. The signed quotation, technical agreement and acceptance record control the final supplied configuration.