Simultaneous Port Boring & Rigid Tapping. Zero Secondary Setups.
Sub-8-Second Cycle Time. Siemens/FANUC Control.
Upload your CAD drawings. Our engineers deliver a cycle time & ROI projection within 48 hours.
Upload Drawings → Supports .pdf / .dwg / .step / .stp — NDA upon requestSee exactly how this machine fits into your workshop. No commitment required.
Get the Free Download → PDF includes: floor plan, utility requirements, tool layoutSimultaneous multi-station machining eliminates sequential bottlenecks. Port boring, reaming, and rigid tapping executed at the same time.
BT40 spindle with hydraulic tool holder ensures tool runout ≤0.003mm. Single clamping, zero re-fixturing errors across all stations.
Pre-wired I/O ports compatible with Siemens/FANUC PLCs. Optional gantry loader, bar feeder, and quality inspection stations.
Quick-changeover fixtures reduce setup time to 30–60 minutes between part families. Ideal for high-mix production environments.
After-sales service points in Brazil, Russia, Turkey, Indonesia, Vietnam, Egypt. 7×24h remote diagnostics included.
Design review → FAT in Taizhou → Shipping → Installation → SAT at your facility. Full documentation in English.
| Parameter | RTM-8 | RTM-10 | RTM-12 | Unit |
|---|---|---|---|---|
| Cycle Time ★ | 5–8 | 3.5–7 | 6–10 | seconds/piece |
| Number of Stations | 8 | 10 | 12 | stations |
| Spindle Power | 7.5 | 7.5 | 7.5 | kW |
| Max Spindle Speed | 6,000 | 6,000 | 6,000 | RPM |
| Tool Shank | BT40 / HSK50A (optional) | — | ||
| Tools per Station | 8 | tools/station | ||
| Total Tool Capacity | 64 | 80 | 96 | tools |
| Positioning Accuracy ★ | ±0.005 | ±0.005 | ±0.005 | mm |
| Repeatability | ±0.003 | mm | ||
| Tool Change Time | ≤2.5 | seconds | ||
| Machine Uptime | ≥95% | % | ||
| Control System ★ | Siemens 828D (standard) / FANUC 0i-MF (optional) | — | ||
| Floor Space | 2,800×1,900 | 3,200×2,100 | 3,600×2,300 | mm |
| Power Supply | AC380V / 50Hz / 3-phase | — | ||
| Total Power Consumption | ~45 | kW | ||
| Machine Weight | ~8,500 | ~11,000 | ~13,500 | kg |
| Lead Time ★ | 3–6 months (FAT included) | — | ||
★ Highlighted parameters are most frequently compared in customer evaluations.
All specifications are subject to final engineering confirmation based on part drawings and production requirements.
| Criteria | APEX RTM-10 ★ | European OEM (e.g. Hydromat) |
|---|---|---|
| Lead Time | 3–4 months | 8–14 months |
| Price Point | 30–50% lower | Premium pricing |
| Cycle Time (valve body) | 3.5–7s/piece | 5–9s/piece |
| After-Sales Response | 7×24h remote + local points | 48–72h, overseas engineer dispatch |
| Customization | Fully custom per part drawings | Standard platforms, limited config |
| Spare Parts | Local warehouse, 48h dispatch | 6–12 weeks lead time |
APEX RTM machines achieve cycle times from 3.5 to 10 seconds per piece, depending on part complexity, number of stations, and number of operations per station. For compressor cylinder applications with 10+ stations, typical cycle time is under 8 seconds. Submit your part drawings for a dedicated cycle time analysis.
Standard: Siemens 828D with ISO G-code support and macro routines. Optional: FANUC 0i-MF or MITSUBISHI M70. All systems include remote diagnostics capability, Ethernet connectivity, and standard tool data management interfaces.
Typical lead time is 3–6 months from order confirmation, including FAT (Factory Acceptance Test) at our facility in Taizhou, China. This covers: design review, machine build, run-off with your sample parts, and final inspection. SAT (Site Acceptance Test) is available at your facility for an additional fee.
Yes. Our modular fixture system allows rapid changeover between part families within 30–60 minutes. For shops requiring high part mix, we recommend the 8-station configuration with quick-changeover top plates. For dedicated high-volume production of a single part type, the 10 or 12-station configuration maximizes throughput.
The RTM series is optimized for three primary industry segments: (1) Valve manufacturing — ball valve bodies, gate valves, check valves with simultaneous port machining; (2) Compressor and HVAC — cylinder blocks for refrigeration and air conditioning manufacturers; (3) Automotive — bearing caps, connecting rods, and suspension components at 60+ PPM.
Send us your part drawings. Our engineering team will provide a complete cycle time analysis, tooling plan, and ROI projection — within 48 hours, at no charge.
NDA available upon request. No commitment required for preliminary analysis.